Fantidis, J. G.. (1397). Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target. , 12(4), 249-256. doi: 10.1007/s40094-018-0312-1
J. G. Fantidis. "Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target". , 12, 4, 1397, 249-256. doi: 10.1007/s40094-018-0312-1
Fantidis, J. G.. (1397). 'Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target', , 12(4), pp. 249-256. doi: 10.1007/s40094-018-0312-1
Fantidis, J. G.. Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target. , 1397; 12(4): 249-256. doi: 10.1007/s40094-018-0312-1


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب