تعداد نشریات | 50 |
تعداد شمارهها | 2,172 |
تعداد مقالات | 20,080 |
تعداد مشاهده مقاله | 23,662,860 |
تعداد دریافت فایل اصل مقاله | 21,743,016 |
Identification and ranking of the influential criteria in flexible jobshop in an automative company | ||
Journal of New Researches in Mathematics | ||
مقالات آماده انتشار، پذیرفته شده، انتشار آنلاین از تاریخ 27 دی 1401 | ||
نوع مقاله: research paper | ||
شناسه دیجیتال (DOI): 10.30495/jnrm.2023.66683.2246 | ||
نویسندگان | ||
Khosro Zamapour1؛ Mohsen Vaez-Ghasemi ![]() | ||
1Department of Industrial Engineering, Central Tehran Branch, Islamic Azad University, Tehran | ||
2Department of Mathematics, Rasht Branch, Islamic Azad University, Gilan, Iran. | ||
3Department of Mathematics, Central Tehran Branch, Islamic Azad University, Tehran | ||
4Department of Mathematics, Shahr-e-Qods Branch, Islamic Azad University,Tehran, Iran. | ||
چکیده | ||
In the last decade, the issue of flexible workshop work has attracted the attention of most researchers and its use in the world of industry. It can be said that flexible workshop scheduling is a developed form of workshop scheduling in which the operation process can be performed on different machines of a set of machines. The recent study has been done with descriptive-analytical methodology and using Delphi methods, best-worst and best priority, with the aim of identifying and ranking the effective criteria in the flexible workshop problem. The criteria were ranked based on library studies, interviews and industry experts' opinions so that those who are more important than others enter the Delphi method and the final criteria are evaluated with less time and fewer round trips . The results of the two methods of best-worst and best priority were compared using computational methods, and since the ranking of the criteria was not the same in both methods, the Spearman correlation coefficient was used to choose which method produced the best results. Was taken. The novelty and uniqueness of this research is the comprehensive evaluation of the criteria compared to previous studies. In this regard, the most appropriate and stable decision-making and ranking methods have been used to identify and identify important evaluation criteria, and after screening and removing the criteria in the focal group and based on the Delphi method, to design a suitable questionnaire for Distribution has taken place among experts. | ||
کلیدواژهها | ||
Ranking؛ Criterion؛ Scheduling؛ Jobshop؛ Multi-criteria decision making | ||
آمار تعداد مشاهده مقاله: 91 |